Lawton was set to sign an MOU with Altus, Durant, and Ardmore to explore a joint entity for acquiring water rights and building a pipeline to move water between cities. This could shape the region's long-term water security.
Donley sewer backup claim denial
A family whose home flooded with raw sewage in May lost a $98,598.89 claim after staff showed their DIY, unpermitted service line replacement — with mismatched rubber joints — was the culprit. They asked for an independent engineering review and got a 7-0 denial.
Lake Levels and Water Restrictions
Combined storage is at 74.48% and stage-one voluntary every-other-day watering could start by late October. With Lake Ellsworth down for dam rehab, another dry summer could force rationing next year.
Hybrid electric bus purchase
Nearly $455K in federal funds that would have expired will now buy three ramp-equipped buses instead of the delayed transfer center — good news for wheelchair and stroller users Rocco Bonacci says he sees everywhere.
Sewer rehabilitation consent order closed after 30 years
The city is finally out from under the 1995 EPA/ODEQ consent order that stemmed from hundreds of sewer overflows every rainstorm. The catch: about 125 more miles of deteriorated line still need replacing, funded through Propel and rate increases.
Alternate water supply and drought resilience
Lawton is designing a groundwater system to survive the next major drought like 2011-2015, when Lake Lawtonka dropped sharply. Three wells can produce 9.6 million gallons a day, but the treatment facility now costs around $40 million and construction takes 25-30 months, so when to build it is the big open question.
Alternate water supply grant
Lawton landed a $5 million federal grant for alternate water supply, including well development — a meaningful cushion for the city's water future, especially relevant given data center water concerns raised later in the meeting.
Stormwater Master Plan Update
The updated plan finds 22 flood problem areas and a 15-year program of seven priority projects estimated at $215 million — roughly $14 million a year. Council tabled acceptance to June 9, and a new stormwater fee method aimed mainly at commercial properties is under legal review.
Scooter's Coffee water main break claim
A homeowner says crews ignored his directions about where the broken main was, tore up his driveway and brick wall unnecessarily, then denied his $4,843 repair claim. The Council tabled the claim to check whether utility locates were actually done.