Oklahoma Record
Broken Arrow

Civic Issues

Topics getting the most attention in Broken Arrow public meetings, ranked by how frequently they are discussed.

Filtered to Water Utilities
Filtered to Medium
Filtered to 30d

10 issues in water utilities with medium priority

MediumWater Utilities

Haikey Creek Lift Station Phase IV upgrade

The joint lift station serving both Tulsa and Broken Arrow flows is severely undersized. The Phase IV project will rebuild it to handle 42 million gallons per day.

1 mention (1 this month)Last discussed Nov 3, 2026
MediumWater Utilities

Turtle Creek Subdivision drainage study funding

The committee was to consider recommending the City Council fund a drainage study for the Turtle Creek Subdivision. A study is usually the first step toward fixing flooding or drainage problems in a neighborhood.

2 mentions (2 this month)Last discussed Oct 26, 2026
MediumWater Utilities↑Rising

Swan Lake Addition drainage improvements funding

The agenda called for the committee to consider recommending DENIAL of funding for drainage improvements in Swan Lake Addition. If confirmed, that would mean no city money directed there for now.

3 mentions (3 this month)Last discussed Oct 26, 2026
MediumWater Utilities

Ninth Street storm sewer improvements underway

A previously approved project to capture water crossing Ninth Street from about 17 acres near Indian Springs is moving forward — materials are being ordered and construction will be scheduled soon, which the 8451 South 9th Street homeowner says should ease his front-yard flooding.

1 mention (1 this month)Last discussed Oct 26, 2026
MediumWater Utilities

Verdigris River Water Treatment Plant Upgrades

A services agreement with Haynes Equipment Company will upgrade the telemetry and SCADA systems that let staff remotely monitor and control water and sewer infrastructure.

2 mentions (1 this month)Last discussed Oct 20, 2026
MediumWater Utilities

ODEQ Consent Order Case No. 25-253

A variance or appeal case before the Board of Adjustment got pushed to March because the board didn't have enough members present. Anyone following this case will have to wait another month for a decision.

2 mentions (1 this month)Last discussed Oct 20, 2026
MediumWater Utilities

Elm Creek Trunk Line Improvements

Cherokee Pride Construction got the contract to replace manholes on the County Line trunk sewer from Washington Street to Houston Street. Aging manholes can leak groundwater into the sewer system, so this saves treatment costs down the line.

2 mentions (1 this month)Last discussed Oct 20, 2026
MediumWater Utilities

Houston Street closure for Old Town waterline work

A narrow stretch of Houston Street (81st Street) between 79th Street and South Winwood Lane closes for about four weeks while crews rebuild the road. It'll be a detour headache for commuters, but the roadway — recently inherited from Wagoner County — was in very poor shape.

3 mentions (1 this month)Last discussed Oct 20, 2026
MediumWater Utilities

Fleet HVAC renovation and lift station rehabilitations

A consultant agreement with Holloway, Updike, and Bellen covers rehabbing the Dresser Rand lift station, the equipment that pumps sewage uphill through the system. Rehabbing it keeps the wastewater flowing and avoids costly failures.

2 mentions (1 this month)Last discussed Oct 6, 2026
MediumWater Utilities

Elm Place water transmission line extension

A 16-inch water transmission line is being extended along Elm Place between Florence Street and Miami Street to strengthen water capacity as part of the city's capital plan and loan program. Bolding Construction won the job with the low bid of about $1.08 million.

1 mention (1 this month)Last discussed Oct 6, 2026